The J-Lay Tower on this pipe-laying vessel required a secure cable supply to the laying tower itself, but also to individual components such as the tensioners (tensioning devices) or the welding systems.
Particularly at the hinge point at the base of the pipe laying tower, a large number of heavy cables had to be routed vertically and safely to the tensioners and other equipment.
In addition to a durable and robust cable routing system that could safely support and move the heavy cable weights, a solution that was as compact and lightweight as possible was also required. The low dead weight of the solution meant that the overall weight could be kept manageable - a factor that also has an impact on the flexibility of the tower and its energy consumption.